Seal penetrations and joints to contain fire, smoke, and toxic gases within fire-rated assemblies.
Firestopping is the installation of fire-resistive materials at penetrations and construction joints in fire-rated walls, floors, and ceilings. Every pipe, conduit, cable tray, and duct that passes through a fire-rated assembly creates a potential path for fire and smoke to spread. ApexSeal NY installs UL-listed firestopping systems that restore the fire rating of the assembly — protecting occupants, limiting property damage, and satisfying code and insurance requirements across NY, NJ, and CT.
We walk the project and identify every penetration and construction joint in fire-rated assemblies — walls, floors, ceilings, and shaft walls.
For each penetration type (pipe, conduit, cable, duct, etc.), we select the appropriate UL-listed firestopping system that matches the assembly rating and penetrant material.
Penetration openings are cleaned and sized correctly. Annular space (the gap between the penetrant and the opening) is verified to fall within the UL system parameters.
Firestopping materials — intumescent sealants, pillows, wraps, collars, or mortar — are installed per the UL system requirements. Each system is labeled with the UL assembly number.
Construction joints (head-of-wall, floor-to-floor, and perimeter joints) are sealed with listed joint systems to maintain the fire rating of the assembly.
We provide a complete firestopping log with photos, UL assembly numbers, and locations for each penetration — required for AHJ inspection and project closeout.
Fireproofing protects structural elements (beams, columns) from losing load-bearing capacity in a fire. Firestopping seals openings in fire-rated assemblies to prevent fire and smoke from spreading between compartments. Both are required on most commercial projects — they serve different but complementary purposes.
Firestopping is inspected by the Authority Having Jurisdiction (AHJ) — typically the local fire marshal or building department — and often by a third-party special inspector. We coordinate with inspectors and provide all required documentation.
Unprotected penetrations can allow fire and smoke to spread rapidly through a building, defeating the purpose of fire-rated construction. It is a code violation that can prevent certificate of occupancy and create significant liability.
Yes, and it often is. We regularly perform firestopping as a final trade before inspection. However, earlier coordination with MEP trades reduces conflicts and rework.
Free estimates. Fast scheduling. No pressure.